Case for Power Controlling |
Project
Introduction:
Inside a modern building, engineers could integrate PLC, generator and other power meters through OPC Server. With the help of OPC Server, it is easy for the engineers obtain the operating data of devices to control or analyze the instruments. |
 |
| |
System
Requirement:
Advantech Studio (SCADA)
Modbus Serial OPC Server
ModbusTCP OPC Server
VESDA Serial OPC Server
PLC、AI/O、DI/O module
An Industry Computer (WINXP SP2) |
|
| System
Diagram:
|
 |
|
Conclusions:
Usually, traditional buildings adapted traditional ways to control the power system. Traditional power controlling system tends to be influenced by outside force easily, such as contract and a power failure); therefore, it required lots of tools to keep systems running smoothly. Now, all the problems mentioned above could be solved easily with the help of OPC Server. |